IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0011 # 02 Y:2001 02 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $73,364 $5,100 Implemented
MI0011 # 03 Y:2001 03 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $18,892 $5,100 Implemented
MI0011 # 04 Y:2001 04 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $114,007 $5,100 Implemented
MI0011 # 05 Y:2001 05 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $316,160 $164,000 Implemented
MI0011 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,793 $19 Implemented
MI0011 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,662 $760 Not Implemented
CO0485 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $229,700 $118,560 Implemented
CO0485 # 02 Y:2001 02 2001 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $59,590 $30,000 n/a
CO0485 # 03 Y:2001 03 2001 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $40,450 $30,000 Not Implemented
CO0485 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,060 $28,000 Implemented
CO0485 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $23,640 $18,000 Implemented
CO0485 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $6,730 $23,000 Not Implemented
CO0485 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $5,980 Implemented
CO0485 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,680 $8,380 Implemented
CO0485 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $2,340 Implemented
CO0485 # 10 Y:2001 10 2001 AUTOMATE FINISHING PROCESS $112,750 $100,000 Implemented
LM0013 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,040 $1,050 Implemented
LM0013 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $0 Implemented
LM0013 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $3,232 $4,900 Not Implemented
LM0013 # 04 Y:2001 04 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $1,152 $1,165 Not Implemented
LM0013 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,776 $300 Implemented
LM0013 # 06 Y:2001 06 2001 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $19,656 $319 Implemented
LM0013 # 07 Y:2001 07 2001 MODIFY WORKLOAD $43,680 $5,000 Implemented
LM0013 # 08 Y:2001 08 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $16,434 $0 Implemented
WV0216 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $167 $136 Not Implemented