Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0342 # 05 Y:2006 | 05 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $76,391 | $42,250 | Implemented |
WV0342 # 06 Y:2006 | 06 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $74,909 | $77,050 | Not Implemented |
WV0342 # 07 Y:2006 | 07 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $41,893 | $112,000 | Implemented |
WV0342 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $26,961 | $1,000 | Implemented |
WV0342 # 09 Y:2006 | 09 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,439 | $2,700 | Implemented |
WV0342 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $23,049 | $280 | Implemented |
WV0342 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $18,125 | $2,570 | Implemented |
WV0342 # 12 Y:2006 | 12 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,068 | $1,000 | Implemented |
WV0342 # 13 Y:2006 | 13 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $11,020 | $1,348 | Implemented |
WV0342 # 14 Y:2006 | 14 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,759 | $35 | Implemented |
WV0342 # 15 Y:2006 | 15 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,938 | $0 | Not Implemented |
WV0342 # 16 Y:2006 | 16 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,240 | $93 | Not Implemented |
WV0342 # 17 Y:2006 | 17 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,975 | $2,344 | Implemented |
UF0377 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,493 | $334 | Not Implemented |
UF0377 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $493 | $415 | Not Implemented |
UF0377 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,064 | $0 | Not Implemented |
UF0377 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $341 | $0 | Not Implemented |
UF0377 # 05 Y:2006 | 05 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $542 | $750 | Not Implemented |
UF0377 # 06 Y:2006 | 06 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,507 | $13,121 | Not Implemented |
UF0377 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,877 | $21,000 | Not Implemented |
UF0377 # 08 Y:2006 | 08 | 2006 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $626,232 | $1,134,871 | Not Implemented |
UF0377 # 09 Y:2006 | 09 | 2006 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,718 | $463 | Not Implemented |
UF0377 # 10 Y:2006 | 10 | 2006 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,000 | $0 | Not Implemented |
UD0741 # 01 Y:2006 | 01 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $65,250 | $10,000 | Not Implemented |
UD0741 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,883 | $133,640 | Not Implemented |