IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0423 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,230 $4,585 Implemented
NC0423 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $4,313 $12,378 Not Implemented
TT0061 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,100 $4,800 Implemented
TT0061 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $195 $0 Implemented
TT0061 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $513 $1,200 Implemented
TT0061 # 04 Y:2011 04 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,900 $0 Implemented
DL0066 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,035 Implemented
DL0066 # 02 Y:2011 02 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $101,455 $36,300 Not Implemented
DL0066 # 03 Y:2011 03 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,460 $2,000 Implemented
DL0066 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,015 $4,000 Implemented
DL0066 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $1,257 Not Implemented
DL0066 # 06 Y:2011 06 2011 UPGRADE CONTROLS ON COMPRESSORS $12,600 $10,000 Not Implemented
DL0066 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,163 $3,750 Not Implemented
LL0345 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $172,828 $126,720 Implemented
LL0345 # 02 Y:2011 02 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $44,703 $4,660 Implemented
LL0345 # 03 Y:2011 03 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $14,141 $1,530 Not Implemented
LL0345 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $6,770 $330 Not Implemented
LL0345 # 05 Y:2011 05 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,985 $840 Not Implemented
LL0345 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $3,331 $4,260 Not Implemented
LL0345 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,394 $1,330 Not Implemented
LL0345 # 08 Y:2011 08 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,296 $1,210 Not Implemented
LL0345 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,578 $15 Not Implemented
LL0345 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $432 $123 Not Implemented
TT0062 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,700 $60,600 Implemented
TT0062 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,900 $36,300 Implemented