IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0267 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,466 $1,031 Implemented
SU0267 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $2,367 $486 Implemented
SU0267 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,959 $2,060 Implemented
SU0267 # 10 Y:2008 10 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $46,739 $23,800 Not Implemented
SU0267 # 11 Y:2008 11 2008 RECOVER AND REUSE SPENT ACID BATHS $1,453 $2,062 Not Implemented
SU0267 # 12 Y:2008 12 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $185 $353 Implemented
SU0267 # 13 Y:2008 13 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $9,244 Implemented
SU0265 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $468 $0 Not Implemented
SU0265 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $191 $0 Not Implemented
SU0265 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $214,622 $23,800 Not Implemented
SU0265 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,615 $252 Implemented
SU0265 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $223 Implemented
SU0265 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $3,368 Not Implemented
SU0265 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $171 $310 Not Implemented
SU0265 # 08 Y:2008 08 2008 OPTIMIZE PLANT POWER FACTOR $921 $4,079 Not Implemented
SU0263 # 01 Y:2008 01 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,456 $0 Not Implemented
SU0263 # 02 Y:2008 02 2008 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,305 $0 Not Implemented
SU0263 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $335 $0 Implemented
SU0263 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,384 $100 Implemented
SU0263 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,354 $121 Not Implemented
SU0263 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,614 $408 Implemented
SU0263 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $230 $258 Implemented
SU0263 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $307 $474 Implemented
SU0263 # 09 Y:2008 09 2008 REDUCE VENTILATION AIR $1,611 $13,919 Not Implemented
SU0264 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,297 $0 Implemented