IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0062 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,100 $6,300 Implemented
TT0062 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,600 $4,200 Implemented
TT0062 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,000 $1,500 Implemented
TT0062 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,800 $26,000 Implemented
TT0062 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,400 $10,000 Implemented
TT0062 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,100 $4,900 Not Implemented
TT0062 # 09 Y:2011 09 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $23,000 $50,000 Not Implemented
TT0062 # 10 Y:2011 10 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $84,900 $45,000 Not Implemented
TT0062 # 11 Y:2011 11 2011 REPLACE DIRECT FIRED WITH STEAM HEAT $78,600 $30,000 Implemented
TT0062 # 12 Y:2011 12 2011 DIRECT WARMEST AIR TO COMBUSTION INTAKE $34,000 $30,000 Not Implemented
UM0382 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $252 $1,000 Not Implemented
UM0382 # 02 Y:2011 02 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $87 $10 Not Implemented
UM0382 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,453 $1,000 Not Implemented
UM0382 # 04 Y:2011 04 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,843 $2,200 Not Implemented
UM0382 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,115 $2,800 Not Implemented
UM0382 # 06 Y:2011 06 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $17,682 $21,309 Not Implemented
UM0382 # 07 Y:2011 07 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,797 $31,000 Not Implemented
UM0383 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,263 $23,909 Not Implemented
UM0383 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $9,728 $5,670 Not Implemented
UM0383 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $3,151 $7,125 Not Implemented
UM0383 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,089 $1,291 Not Implemented
UM0383 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,601 $7,500 Not Implemented
UM0383 # 06 Y:2011 06 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,466 $4,400 Not Implemented
UM0383 # 07 Y:2011 07 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,452 $7,236 Not Implemented
UM0383 # 08 Y:2011 08 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,035 $1,207 Not Implemented