IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0447 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,627 $26,290 Not Implemented
AS0447 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $827 $80 Implemented
AS0447 # 04 Y:2017 04 2017 SELL COMBUSTIBLE WASTE $32,800 $9 Not Implemented
AS0447 # 01 Y:2017 01 2017 INSTALL SKYLIGHTS $2,950 $11,772 Not Implemented
MA0778 # 05 Y:2017 05 2017 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $8,708 $9,000 Not Implemented
MA0778 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,137 $11,649 Implemented
MA0778 # 03 Y:2017 03 2017 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $17,175 $73,000 Implemented
MA0778 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $17,208 $14,500 Implemented
MA0778 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,550 $132,200 Not Implemented
MA0777 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,579 $137,422 Not Implemented
MA0777 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,627 $11,435 Not Implemented
MA0777 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,805 $3,330 Not Implemented
MA0777 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $2,136 $5,392 Not Implemented
MA0777 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,610 $30,976 Not Implemented
TT0193 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $5,162 $360 Not Implemented
TT0193 # 09 Y:2017 09 2017 INSTALL TIMERS AND/OR THERMOSTATS $464 $2,000 Implemented
TT0193 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $3,000 Implemented
TT0193 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $1,978 $4,283 Not Implemented
TT0193 # 08 Y:2017 08 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $949 $125 Implemented
TT0193 # 06 Y:2017 06 2017 INSTALL COMMON HEADER ON COMPRESSORS $3,186 $8,600 Not Implemented
TT0193 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $35,857 $10,000 Implemented
TT0193 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,374 $32,000 Implemented
TT0193 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,088 $22,470 Not Implemented
DL0174 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,710 $18,000 Not Implemented
DL0174 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,170 $4,000 Not Implemented