IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 32562 Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0598 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,338 $432 Implemented
UF0598 # 03 Y:2023 03 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $30,832 $8,310 Implemented
UF0598 # 08 Y:2023 08 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $8,114 $0 Implemented
UF0598 # 10 Y:2023 10 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,588 $2,800 Implemented
UF0598 # 09 Y:2023 09 2023 INSTALL TURBULATORS $6,732 $7,500 Implemented
UF0598 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,433 $14,328 Implemented
UF0598 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,556 $22,000 Implemented
UF0598 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $61,221 $34,460 Implemented
WV0642 # 11 Y:2023 11 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,222 $1,250 Implemented
WV0642 # 13 Y:2023 13 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $807 $970 Implemented
WV0642 # 12 Y:2023 12 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,386 $200 Implemented
WV0642 # 14 Y:2023 14 2023 INSULATE BARE EQUIPMENT $239 $503 Implemented
WV0642 # 06 Y:2023 06 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,167 $1,500 Implemented
WV0642 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $2,563 $5,683 Implemented
WV0642 # 10 Y:2023 10 2023 UPGRADE CONTROLS ON COMPRESSORS $2,313 $3,080 Implemented
WV0642 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,435 $1,980 Implemented
WV0642 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,587 $3,721 Implemented
SD0621 # 01 Y:2021 01 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,319 $0 Implemented
SD0621 # 02 Y:2021 02 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,887 $10,000 Implemented
MI0397 # 05 Y:2021 05 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,631 $40 Implemented
MI0397 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,361 $40 Implemented
LE0492 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,300 $8,123 Implemented
LE0492 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,071 $22,500 Implemented
AS0475 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $159 $752 Implemented
AS0475 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,779 $895 Implemented