Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,876
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1065 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,046 | $952 | Implemented |
UD1065 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,980 | $2,457 | Implemented |
UC2308 # 09 Y:2023 | 09 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $998 | $3,691 | Implemented |
UC2308 # 02 Y:2023 | 02 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $41,561 | $0 | Implemented |
UC2308 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $204,687 | $50,000 | Implemented |
UC2308 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,434 | $300 | Implemented |
UC2308 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,353 | $987 | Implemented |
UF0596 # 02 Y:2023 | 02 | 2023 | INSTALL SUB-METERING EQUIPMENT | $266,539 | $15,232 | Implemented |
UF0596 # 11 Y:2023 | 11 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,156 | $2,352 | Implemented |
UF0596 # 05 Y:2023 | 05 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $145,162 | $141,225 | Implemented |
UF0596 # 07 Y:2023 | 07 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $47,000 | $171,903 | Implemented |
UF0596 # 10 Y:2023 | 10 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $26,447 | $4,768 | Implemented |
UF0596 # 06 Y:2023 | 06 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $50,904 | $49,563 | Implemented |
UF0596 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,499 | $1,399 | Implemented |
UF0596 # 04 Y:2023 | 04 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $213,087 | $0 | Implemented |
UF0596 # 03 Y:2023 | 03 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $232,670 | $300,000 | Implemented |
UF0596 # 09 Y:2023 | 09 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,289 | $25,440 | Implemented |
UF0595 # 07 Y:2023 | 07 | 2023 | INSTALL SUB-METERING EQUIPMENT | $1,589 | $4,340 | Implemented |
UF0595 # 10 Y:2023 | 10 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $20,697 | $4,480 | Implemented |
UF0595 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,458 | $356 | Implemented |
UF0595 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $1,092 | $2,160 | Implemented |
UF0595 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,931 | $25,400 | Implemented |
UF0595 # 08 Y:2023 | 08 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,317 | $5,838 | Implemented |
UF0595 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $39,683 | $20,785 | Implemented |
UF0595 # 06 Y:2023 | 06 | 2023 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,957 | $3,276 | Implemented |