IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0334 # 07 Y:2007 07 2007 USE SYNTHETIC LUBRICANT $3,966 $301 Implemented
BD0334 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,999 $1,576 Implemented
BD0334 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,625 $24,551 Implemented
BD0334 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,532 $3,690 Implemented
BD0334 # 01 Y:2007 01 2007 USE RADIANT HEATER FOR SPOT HEATING $242,313 $111,001 Implemented
MA0624 # 01 Y:2007 01 2007 REPAIR OR REPLACE STEAM TRAPS $62,300 $24,500 Implemented
MA0624 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,045 $5,670 Implemented
MA0624 # 10 Y:2007 10 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $4,007 $12,000 Implemented
MA0624 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,655 $4,000 Implemented
MA0624 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,741 $0 Implemented
MA0624 # 06 Y:2007 06 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,448 $2,500 Implemented
MA0624 # 05 Y:2007 05 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $12,255 $75,000 Implemented
MA0624 # 04 Y:2007 04 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $14,298 $11,500 Implemented
MA0624 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,012 $50,000 Implemented
AM0534 # 08 Y:2007 08 2007 USE SYNTHETIC LUBRICANT $320 $0 Implemented
AM0534 # 06 Y:2007 06 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,370 $0 Implemented
AM0534 # 05 Y:2007 05 2007 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,560 $0 Implemented
AM0534 # 04 Y:2007 04 2007 COVER OPEN TANKS $2,500 $0 Implemented
AM0534 # 03 Y:2007 03 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $7,200 $2,000 Implemented
AM0534 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,500 $20 Implemented
AM0534 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,500 $1,500 Implemented
WV0361 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,204 $2,000 Implemented
WV0361 # 08 Y:2007 08 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $657 $276 Implemented
WV0361 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $0 Implemented
WV0361 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $42,691 $13,780 Implemented