IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0483 # 03 Y:2019 03 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,352 $12,000 Not Implemented
LE0483 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,044 $11,000 Not Implemented
LE0483 # 01 Y:2019 01 2019 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $200 $40 Implemented
LE0483 # 04 Y:2019 04 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,605 $12,900 Not Implemented
LE0483 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,574 $20,000 Implemented
UF0536 # 04 Y:2019 04 2019 CLEAN CONDENSER TUBES $4,554 $4,248 Not Implemented
UF0536 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,130 $557 Not Implemented
UF0536 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,331 $25,000 Not Implemented
UF0536 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,433 $2,264 Not Implemented
UF0536 # 05 Y:2019 05 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $25,860 $33,265 Not Implemented
UF0536 # 06 Y:2019 06 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,000 $18,548 Not Implemented
UF0536 # 07 Y:2019 07 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,297 $3,028 Not Implemented
WM0140 # 09 Y:2019 09 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $582 $70 Not Implemented
WM0140 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $510 Not Implemented
WM0140 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,432 $51,563 Implemented
WM0140 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,984 $27,284 Implemented
WM0140 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,570 $745 Not Implemented
WM0140 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,464 $1,711 Not Implemented
WM0140 # 05 Y:2019 05 2019 INSTALL AUTOMATIC STACK DAMPER $1,941 $2,080 Not Implemented
WM0140 # 06 Y:2019 06 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,102 $230 Not Implemented
WM0140 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,092 $0 Implemented
TT0227 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $550 Not Implemented
TT0227 # 03 Y:2019 03 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,828 $5,000 Implemented
TT0227 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,143 $2,500 Not Implemented
TT0227 # 01 Y:2019 01 2019 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $73,127 $4,450 Not Implemented