IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0395 # 07 Y:1989 07 1989 REDUCE FLUID FLOW RATES $26,673 $3,000 Implemented
GT0395 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,220 $10,000 Not Implemented
GT0395 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $650 $1,385 Not Implemented
GT0395 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $12,473 $5,292 Implemented
GT0395 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $877 $187 Implemented
GT0395 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,422 $0 Implemented
GT0395 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,749 $2,250 Implemented
GT0393 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $904 $10,000 Not Implemented
GT0393 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $739 $0 Implemented
GT0393 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,113 $0 Implemented
GT0393 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $957 $790 Implemented
GT0393 # 06 Y:1989 06 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $550 $534 Not Implemented
GT0393 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,494 $3,000 Implemented
GT0393 # 07 Y:1989 07 1989 USE MINIMUM STEAM OPERATING PRESSURE $933 $0 Not Implemented
GT0393 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,350 $2,699 Implemented
OR0067 # 06 Y:1989 06 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,243 $1,755 Implemented
OR0067 # 07 Y:1989 07 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,141 $14,400 Not Implemented
OR0067 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,207 $1,800 Implemented
OR0067 # 04 Y:1989 04 1989 INCREASE AMOUNT OF CONDENSATE RETURNED $4,079 $4,000 Implemented
OR0067 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,329 $5,500 Not Implemented
OR0067 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,279 $385 Implemented
OR0067 # 01 Y:1989 01 1989 USE MINIMUM STEAM OPERATING PRESSURE $7,313 $0 Not Implemented
GT0385 # 05 Y:1989 05 1989 MODIFY TEXTILE DRYERS $13,700 $0 Implemented
WI0067 # 12 Y:1989 12 1989 INSTALL STORM WINDOWS AND DOORS $432 $1,488 Implemented
GT0385 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,000 $1,000 Implemented