IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2393 Textile Bags
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0580 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,371 $34,720 Implemented
MA0580 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,798 $1,375 Implemented
MA0580 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,905 $0 Implemented
LE0185 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $915 $100 Implemented
LE0185 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,631 $76,467 Implemented
AM0452 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $500 Implemented
AM0452 # 04 Y:2004 04 2004 $13,600 $2,300 Implemented
AM0452 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,600 $21,200 Implemented
AM0452 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $980 $0 Implemented
AM0452 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43,054 $139,284 Implemented
AM0452 # 02 Y:2004 02 2004 $67,000 $100,000 Implemented
UD0590 # 05 Y:2000 05 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $811 $0 Implemented
UD0590 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,607 $2,240 Implemented
UD0590 # 02 Y:2000 02 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $35,359 $10,000 Implemented
UD0189 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $952 $0 Implemented
UD0189 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,061 $5,112 Implemented
ST0039 # 05 Y:1985 05 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $207 $0 Implemented
ST0039 # 06 Y:1985 06 1985 USE COMPRESSOR AIR FILTERS $136 $80 Implemented
ST0039 # 10 Y:1985 10 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $691 $537 Implemented
ST0039 # 11 Y:1985 11 1985 INSULATE BARE EQUIPMENT $1,068 $944 Implemented
ST0039 # 12 Y:1985 12 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $171 $74 Implemented
ST0039 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $61 $60 Implemented
ST0039 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,489 $24 Implemented
ST0039 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,649 $220 Implemented