IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0078 # 07 Y:1986 07 1986 REDESIGN PROCESS $112,427 $120,000 Not Implemented
CO0078 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,730 $1,000 Not Implemented
CO0078 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,242 $300 Implemented
CO0078 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,746 $3,000 Implemented
CO0078 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,055 $1,000 Implemented
CO0078 # 01 Y:1986 01 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $20,490 $100,000 Not Implemented
CO0078 # 02 Y:1986 02 1986 OPTIMIZE PLANT POWER FACTOR $6,480 $2,459 Implemented
LT0071 # 03 Y:1986 03 1986 USE OPTIMUM TEMPERATURE $33,764 $3,000 Not Implemented
CO0074 # 01 Y:1986 01 1986 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $11,487 $120,000 Not Implemented
LT0071 # 02 Y:1986 02 1986 REDUCE EXCESSIVE BOILER BLOWDOWN $20,288 $9,000 Implemented
LT0071 # 01 Y:1986 01 1986 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $52,000 $6,000 Implemented
LT0071 # 04 Y:1986 04 1986 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $199,300 $690,000 Not Implemented
LT0071 # 05 Y:1986 05 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $751 $155 Implemented
CO0074 # 12 Y:1986 12 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $132 Implemented
CO0074 # 11 Y:1986 11 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,405 $1,000 Not Implemented
CO0074 # 10 Y:1986 10 1986 INSTALL TIMERS AND/OR THERMOSTATS $638 $200 Not Implemented
CO0074 # 09 Y:1986 09 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,571 $500 Implemented
CO0074 # 08 Y:1986 08 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,810 $0 Implemented
CO0074 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,296 $400 Implemented
CO0074 # 05 Y:1986 05 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,018 $0 Implemented
CO0074 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $1,724 $2,000 Not Implemented
CO0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $16,456 $0 Implemented
CO0074 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,038 $4,650 Implemented
ST0073 # 09 Y:1986 09 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,448 $1,596 Not Implemented
AT0049 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $3,879 Implemented