IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0071 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,682 $5,000 Implemented
OR0071 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $106 $181 Implemented
OR0071 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,915 $500 Not Implemented
OR0071 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $900 $2,250 Not Implemented
OR0071 # 05 Y:1989 05 1989 REDUCE FLUID FLOW RATES $4,615 $12,560 Implemented
OR0068 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,848 $500 Implemented
OR0068 # 10 Y:1989 10 1989 OPTIMIZE PLANT POWER FACTOR $2,056 $3,300 Not Implemented
OR0068 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,867 $2,499 Implemented
OR0068 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,258 $370 Not Implemented
OR0068 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,642 $0 Not Implemented
OR0069 # 08 Y:1989 08 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,105 $55,093 Implemented
OR0069 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $108 $200 Implemented
OR0068 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $5,010 $0 Implemented
OR0069 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,222 $500 Implemented
OR0069 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $952 $300 Implemented
OR0069 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $725 $100 Implemented
OR0069 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $59 $45 Implemented
OR0069 # 01 Y:1989 01 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,137 $0 Implemented
OR0069 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,854 $3,938 Implemented
OR0068 # 07 Y:1989 07 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,272 $2,814 Not Implemented
OR0068 # 08 Y:1989 08 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $704 $576 Not Implemented
OR0068 # 03 Y:1989 03 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $2,409 $0 Implemented
OR0068 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,552 $3,000 Implemented
OR0068 # 11 Y:1989 11 1989 REDUCE OR ELIMINATE WASTE $268,559 $1,000,000 Not Implemented
GT0388 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,330 $3,000 Not Implemented