IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0795 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $2,512 Implemented
LE0465 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,416 $1,000 Implemented
LE0465 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $19,292 Implemented
MI0343 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,896 $6,486 Implemented
MI0343 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $30,500 $3,280 Implemented
MI0343 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $236,442 $800,000 Implemented
MI0343 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $7,675 Implemented
MI0343 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,400 $71,328 Implemented
MI0343 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,079 $2,030 Implemented
WV0566 # 02 Y:2018 02 2018 DEVELOP A REPAIR/REPLACE POLICY $4,621 $945 Implemented
WV0566 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $1,217 $3,150 Implemented
WV0566 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,255 $600 Implemented
WV0566 # 10 Y:2018 10 2018 INSULATE BARE EQUIPMENT $114 $180 Implemented
WV0566 # 09 Y:2018 09 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $50 Implemented
WV0566 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,581 $575 Implemented
WV0566 # 04 Y:2018 04 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,029 $500 Implemented
NC0620 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,426 $100 Implemented
NC0620 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $927 $1,000 Implemented
NC0620 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,189 $2,250 Implemented
OK0992 # 07 Y:2018 07 2018 INSTALL SET-BACK TIMERS $2,280 $1,284 Implemented
OK0992 # 09 Y:2018 09 2018 PAY UTILITY BILLS ON TIME $310 $0 Implemented
OK0992 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,701 $15,796 Implemented
OK0992 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $208 $0 Implemented
OK0992 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $450 Implemented
OK0992 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $259 Implemented