IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0230 # 06 Y:1991 06 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,264 $0 Not Implemented
MA0228 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,585 $15,000 Not Implemented
MA0228 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $2,000 Implemented
MA0228 # 02 Y:1991 02 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $8,647 $5,000 Implemented
MA0228 # 01 Y:1991 01 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $27,069 $0 Not Implemented
MA0228 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $400 Implemented
MA0228 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $458 $430 Implemented
CO0229 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,221 $0 Implemented
CO0229 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $721 $750 Implemented
MA0230 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,842 $300 Not Implemented
IA0012 # 01 Y:1991 01 1991 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $32,690 $52,000 Not Implemented
CO0229 # 08 Y:1991 08 1991 INSULATE BARE EQUIPMENT $1,715 $3,130 Implemented
MA0230 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $3,643 $9,600 Not Implemented
CO0229 # 02 Y:1991 02 1991 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,750 $1,050 Implemented
CO0229 # 06 Y:1991 06 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $800 $1,730 Implemented
CO0229 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $200 Implemented
MA0230 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $4,761 $4,725 Not Implemented
CO0229 # 07 Y:1991 07 1991 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $1,600 $3,200 Implemented
IA0012 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,630 $6,000 Not Implemented
CO0229 # 09 Y:1991 09 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $670 $1,600 Implemented
CO0229 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $400 $450 Implemented
MA0230 # 01 Y:1991 01 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,447 $11,800 Not Implemented
MA0230 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,665 $30,800 Not Implemented
IA0012 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $0 Not Implemented
IA0012 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,436 $1,120 Not Implemented