IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

760

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0244 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,023 $521 Implemented
UM0244 # 03 Y:2003 03 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $582 $2,477 Not Implemented
UM0244 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,221 Not Implemented
UM0244 # 02 Y:2003 02 2003 SIZE TRUCKS TO JOB $76,800 $54,000 Implemented
UM0244 # 01 Y:2003 01 2003 $101,745 $30,000 Not Implemented
UM0244 # 04 Y:2003 04 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $51,860 Not Implemented
MA0543 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,953 $12,400 Not Implemented
MA0543 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,705 $21,900 n/a
MA0543 # 07 Y:2003 07 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,408 $527 Implemented
MA0543 # 02 Y:2003 02 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $26,717 $40,000 Not Implemented
MA0543 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,571 $12,104 Implemented
MA0543 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,265 $0 Not Implemented
MA0543 # 04 Y:2003 04 2003 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,292 $0 Not Implemented
BD0248 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $439 $175 Implemented
BD0248 # 16 Y:2003 16 2003 USE POWER DURING OFF-PEAK PERIODS $7,578 $2,000 Not Implemented
BD0248 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,613 $450 Not Implemented
BD0248 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $0 Implemented
BD0248 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,140 $23,175 Implemented
BD0248 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,672 $24,600 n/a
BD0248 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $48,696 $13,832 n/a
BD0248 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $1,196 $1,575 Not Implemented
BD0248 # 14 Y:2003 14 2003 MINIMIZE WATER USAGE $287 $460 Not Implemented
BD0248 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $600 Implemented
BD0248 # 17 Y:2003 17 2003 $936 $2,500 Not Implemented
BD0248 # 15 Y:2003 15 2003 $28,938 $3,000 Implemented