Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
587
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0212 # 05 Y:1998 | 05 | 1998 | $26,000 | $3,120 | n/a | |
UL0212 # 02 Y:1998 | 02 | 1998 | OPTIMIZE PLANT POWER FACTOR | $3,040 | $2,176 | n/a |
UL0212 # 01 Y:1998 | 01 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,802 | $100 | n/a |
UL0212 # 03 Y:1998 | 03 | 1998 | MINIMIZE USE OF RAGS THROUGH WORKER TRAINING | $3,175 | $1,625 | n/a |
UL0212 # 04 Y:1998 | 04 | 1998 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $1,567 | $5,070 | n/a |
HO0175 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,263 | $16,755 | Implemented |
HO0175 # 06 Y:1998 | 06 | 1998 | $18,000 | $3,000 | Implemented | |
HO0175 # 05 Y:1998 | 05 | 1998 | $9,375 | $0 | Implemented | |
HO0175 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $800 | $300 | Implemented |
HO0175 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $3,201 | $168 | Implemented |
HO0175 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $320 | $500 | Not Implemented |
AS0240 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $4,646 | $30 | Implemented |
AS0240 # 02 Y:1998 | 02 | 1998 | INSTALL SKYLIGHTS | $2,417 | $7,500 | Not Implemented |
AS0240 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,086 | $3,800 | Implemented |
AS0240 # 06 Y:1998 | 06 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,896 | $60 | Implemented |
AS0240 # 07 Y:1998 | 07 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $37,961 | $240 | Not Implemented |
AS0240 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,167 | $9,143 | Not Implemented |
AS0240 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,175 | $8,691 | Implemented |
AS0240 # 08 Y:1998 | 08 | 1998 | $41,874 | $2,680 | Not Implemented | |
OD0125 # 02 Y:1998 | 02 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $704 | $840 | Implemented |
OD0125 # 03 Y:1998 | 03 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,650 | $630 | Implemented |
OD0125 # 04 Y:1998 | 04 | 1998 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,182 | $8,000 | Not Implemented |
OD0125 # 05 Y:1998 | 05 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,293 | $1,295 | Not Implemented |
OD0125 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,283 | $67,670 | Implemented |
OD0125 # 06 Y:1998 | 06 | 1998 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $619 | $0 | Implemented |