IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3083 Laminated Plastics Plate & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0055 # 07 Y:2010 07 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $0 $0 Implemented
MZ0055 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $0 $0 Implemented
MZ0055 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,282 $16,460 Implemented
MZ0055 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,900 $1,160 Implemented
MZ0055 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,916 $1,100 Implemented
LE0301 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0301 # 16 Y:2010 16 2010 INSTALL TIMERS AND/OR THERMOSTATS $153 $1,000 Implemented
LE0301 # 15 Y:2010 15 2010 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0301 # 14 Y:2010 14 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Implemented
LE0301 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $2,440 Implemented
LE0301 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Implemented
LE0301 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0301 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
UD0820 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $644 $1 Implemented
UD0820 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,408 $5,940 Implemented
UD0820 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $4,868 Implemented
UD0820 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,925 $4,465 Implemented
UD0820 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,316 $2,585 Implemented
UD0820 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $535 $500 Implemented
UD0820 # 09 Y:2010 09 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $513 $1,580 Implemented
UD0820 # 10 Y:2010 10 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $17,532 $7,000 Implemented
UD0820 # 14 Y:2010 14 2010 USE RADIANT HEATER FOR SPOT HEATING $4,962 $4,550 Implemented