IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3466 Crowns And Closures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0537 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,920 $245,000 Implemented
LE0537 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,096 $67,533 Implemented
LE0537 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $825 $570 Implemented
LE0537 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $167,234 $0 Implemented
UL2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,490 $11,516 Implemented
UL2205 # 05 Y:2022 05 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,986 $0 Implemented
UD1035 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,050 $0 Implemented
UD1035 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,106 $5,256 Implemented
UD1035 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $128 $0 Implemented
LE0456 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,041 $40,000 Implemented
LE0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $783 $3,200 Implemented
LE0456 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,979 $50,000 Implemented
LE0456 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,140 $3,500 Implemented
LE0456 # 01 Y:2018 01 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,810 $36 Implemented
TT0202 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,716 $83,867 Implemented
TT0202 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $16,093 $1,430 Implemented
TT0202 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $403 $678 Implemented
TT0202 # 07 Y:2017 07 2017 INSTALL TIMERS AND/OR THERMOSTATS $197 $100 Implemented
IP0065 # 12 Y:2016 12 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $548 $957 Implemented
IP0065 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $840 Implemented
IP0065 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $198 Implemented
IP0065 # 05 Y:2016 05 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,760 $93 Implemented
IP0065 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,873 $422 Implemented
IP0065 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,844 $181 Implemented
IP0065 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,539 $77 Implemented