IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0412 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,454 $190 Implemented
UD0414 # 01 Y:1993 01 1993 PAY UTILITY BILLS ON TIME $2,100 $0 Implemented
UD0414 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $14,248 Implemented
UD0414 # 05 Y:1993 05 1993 INSTALL SET-BACK TIMERS $1,689 $1,500 Implemented
UD0414 # 04 Y:1993 04 1993 INSTALL SET-BACK TIMERS $1,773 $500 Implemented
KU0412 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $480 Implemented
KU0412 # 05 Y:1993 05 1993 RECOVER AND REUSE COOLING WATER $11,879 $200 Implemented
KU0412 # 10 Y:1993 10 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $548 $946 Implemented
KU0417 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $518 $577 Implemented
KU0417 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $3,966 Implemented
KU0417 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $230 $180 Implemented
ND0176 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $5,381 $3,268 Implemented
ND0176 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $730 Implemented
ND0176 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,100 $2,000 Implemented
ND0176 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,341 $200 Implemented
ND0176 # 01 Y:1993 01 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,873 $500 Implemented
CO0287 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,180 $16,170 Implemented
IA0067 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,729 $6,000 Implemented
IA0067 # 03 Y:1993 03 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,054 $4,750 Implemented
IA0067 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $0 Implemented
AR0008 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $130 Implemented
KU0405 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,867 $475 Implemented
KU0405 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
IA0059 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,568 $27,000 Implemented
IA0059 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,455 $0 Implemented