Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,642
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1111 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $129,812 | $935,220 | n/a |
OK1111 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,608 | $3,599 | n/a |
OK1111 # 05 Y:2024 | 05 | 2024 | OPERATE BOILERS ON HIGH FIRE SETTING | $935 | $22,000 | n/a |
OK1111 # 08 Y:2024 | 08 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $499 | $236 | n/a |
OK1111 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $83 | $83 | n/a |
OK1111 # 07 Y:2024 | 07 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $7,982 | $16,792 | n/a |
OK1111 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,271 | $46,928 | n/a |
OK1111 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,469 | $113,104 | n/a |
OK1109 # 08 Y:2024 | 08 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $18,482 | $120,578 | n/a |
OK1109 # 07 Y:2024 | 07 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,413 | $3,850 | n/a |
OK1109 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,867 | $38,775 | n/a |
OK1109 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $213 | $820 | n/a |
OK1109 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,576 | $44,000 | n/a |
OK1109 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,213 | $394,200 | n/a |
OK1109 # 05 Y:2024 | 05 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,582 | $11,028 | n/a |
OK1109 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $125 | $825 | n/a |
OK1109 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,162 | $3,598 | n/a |
UW2405 # 04 Y:2024 | 04 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $150,000 | $200,000 | n/a |
UW2405 # 02 Y:2024 | 02 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $4,277 | $12,000 | n/a |
UW2405 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $24,745 | $24,732 | n/a |
UW2405 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,834 | $25,000 | n/a |
MI0438 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,979 | $1,660 | n/a |
MI0438 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $116,907 | $0 | n/a |
MI0438 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $26,088 | $956 | n/a |
MI0438 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $52,928 | $1,320 | n/a |