IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0188 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $81,560 $200,000 Not Implemented
UA0188 # 02 Y:2018 02 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,707 $7,500 Not Implemented
UA0188 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,552 $64,329 Not Implemented
UA0188 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,516 $500 Implemented
UA0188 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,745 $2,465 Implemented
UA0188 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $1,389 $737 Implemented
UA0179 # 09 Y:2017 09 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,242 $1,015 Implemented
UA0179 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $429 $247 Implemented
UA0179 # 07 Y:2017 07 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,673 $7,500 Not Implemented
UA0179 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $53,482 $100,000 Not Implemented
UA0179 # 02 Y:2017 02 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $44,167 $500 Not Implemented
UA0179 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,876 $42,452 Not Implemented
UA0179 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,851 $250 Implemented
UA0179 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,243 $1,165 Implemented
UA0179 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,934 $6,152 Not Implemented
UA0138 # 01 Y:2015 01 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $27,518 $0 Not Implemented
UA0138 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $671 $658 Not Implemented
UA0138 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $3,174 $3,210 Not Implemented
UA0138 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,270 $3,920 Not Implemented
UA0138 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $557 $186 Not Implemented
UA0131 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $6,471 $2,508 Implemented
UA0131 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,501 $4,321 Not Implemented
UA0131 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,273 $10,071 Not Implemented
UA0131 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,179 $127,000 Not Implemented
UA0105 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $564 $426 Implemented