IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0092 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $187,982 $150,000 Not Implemented
UA0092 # 02 Y:2013 02 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $37,964 $77,760 Not Implemented
UA0092 # 03 Y:2013 03 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $25,845 $25,121 Implemented
UA0092 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $62,047 $15,800 Not Implemented
UA0092 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,460 $6,200 Implemented
UA0092 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,421 $135 Implemented
UA0090 # 01 Y:2012 01 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $11,862 $26,757 Not Implemented
UA0090 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,021 $2,488 Not Implemented
UA0090 # 03 Y:2012 03 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,678 $142 Implemented
UA0090 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,518 $13,900 Not Implemented
UA0090 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $4,203 Not Implemented
UA0090 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,138 $2,200 Implemented
UA0090 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $12,249 Not Implemented
UA3022 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $54,140 $50 Not Implemented
UA3022 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,511 $15,063 Not Implemented
UA3022 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $12,180 $50 Not Implemented
UA3022 # 04 Y:2012 04 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,995 $90,750 Not Implemented
UA3020 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $35,953 $25,000 Not Implemented
UA3020 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,898 $9,195 Implemented
UA3020 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,967 $800 Not Implemented
UA3020 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $1,775 $2,010 Implemented
UA3020 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,260 $1,155 Not Implemented
UA3020 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,818 $879 Not Implemented
UA0077 # 01 Y:2012 01 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,475 $1,000 Not Implemented
UA0077 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,282 $20,463 Not Implemented