Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0119 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,511 $10,368 Not Implemented
MS0119 # 04 Y:1998 04 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $32,240 $31,500 Implemented
MS0119 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $1,266 $440 Implemented
MS0119 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,580 $31,767 Not Implemented
MS0119 # 05 Y:1998 05 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,983 $0 Implemented
MS0119 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,424 $21,311 Not Implemented
MS0119 # 09 Y:1998 09 1998 $8,100 $5,729 Not Implemented
MS0119 # 08 Y:1998 08 1998 BURN WASTE OIL FOR HEAT $26,282 $24,283 Not Implemented
MS0119 # 10 Y:1998 10 1998 $110,250 $31,460 Implemented
MS0119 # 01 Y:1998 01 1998 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $24,225 $7,315 Not Implemented
GT0640 # 06 Y:1998 06 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,660 $5,675 Implemented
GT0640 # 09 Y:1998 09 1998 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $36,424 $92,125 Not Implemented
GT0640 # 08 Y:1998 08 1998 METER WASTE WATER $7,180 $8,000 Implemented
GT0640 # 07 Y:1998 07 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,741 $7,900 Implemented
GT0640 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $5,590 $200 Not Implemented
GT0640 # 04 Y:1998 04 1998 UPGRADE CONTROLS ON COMPRESSORS $7,000 $5,000 Implemented
GT0640 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,249 $0 Not Implemented
GT0640 # 02 Y:1998 02 1998 COMBINE UTILITY METERS $5,560 $0 Implemented
GT0640 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $28,530 $45,720 Implemented
MS0109 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,919 $17,023 Not Implemented
MS0109 # 03 Y:1998 03 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,627 $6,800 Not Implemented
MS0109 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $3,776 Implemented
MS0109 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,944 $6,500 Not Implemented
MS0109 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $1,077 $1,898 Implemented
MS0109 # 02 Y:1998 02 1998 INSTALL TIMERS AND/OR THERMOSTATS $402 $232 Implemented