IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0036 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,392 $0 Implemented
UA0036 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $3,429 $1,700 Implemented
UA0036 # 03 Y:2009 03 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,005 $15,600 Not Implemented
UA0036 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,387 $40,768 Implemented
UA0036 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $6,452 $10,320 Not Implemented
UA0036 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,500 Implemented
UA0036 # 07 Y:2009 07 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,637 $17,500 Not Implemented
UA0036 # 08 Y:2009 08 2009 USE PHOTOCELL CONTROLS $453 $1,337 Not Implemented
UA0031 # 08 Y:2009 08 2009 INSULATE BARE EQUIPMENT $350 $610 Implemented
UA0031 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,782 $1,385 Not Implemented
UA0031 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $1,573 $300 Not Implemented
UA0031 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $1,500 Implemented
UA0031 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,868 $0 Not Implemented
UA0031 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,044 $510 Implemented
UA0031 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $3,768 $1,894 Not Implemented
UA0031 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,812 $41,878 Implemented
UA0029 # 08 Y:2009 08 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $7,112 $109 Not Implemented
UA0029 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,902 $17,383 Implemented
UA0029 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,679 $0 Implemented
UA0029 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,613 $1,500 Not Implemented
UA0029 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $6,679 $2,900 Not Implemented
UA0029 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $14,634 Implemented
UA0029 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $650 $1,416 Implemented
UA0029 # 01 Y:2009 01 2009 USE PHOTOCELL CONTROLS $41 $109 Not Implemented