IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0028 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $2,703 $475 Not Implemented
UA0028 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $23,591 $34,365 Not Implemented
UA0028 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,651 $1,500 Not Implemented
UA0028 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,006 $0 Not Implemented
UA0011 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,624 $122,055 Implemented
UA0011 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,713 $91,928 Not Implemented
UA0011 # 03 Y:2007 03 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,081 $0 Implemented
UA0011 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,894 $700 Implemented
UA0011 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,753 $0 Not Implemented
UA0011 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,493 $2,877 Not Implemented
UA0011 # 07 Y:2007 07 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,174 $0 Not Implemented
UA0011 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $364 $346 Not Implemented
UA0003 # 01 Y:2007 01 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $65,640 $16,926 Not Implemented
UA0003 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,585 $54,205 Not Implemented
UA0003 # 03 Y:2007 03 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $43,286 $20,950 Not Implemented
UA0003 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,528 $0 Not Implemented
UA0003 # 05 Y:2007 05 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,563 $0 Not Implemented
UA0003 # 06 Y:2007 06 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,422 $0 Not Implemented
UA0003 # 07 Y:2007 07 2007 INSTALL TIMERS AND/OR THERMOSTATS $814 $1,180 Not Implemented
UA0003 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $166 $158 Not Implemented
MS0103 # 01 Y:1998 01 1998 USE SYNTHETIC LUBRICANT $951 $239 Implemented
MS0103 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,645 $8,030 Not Implemented
MS0103 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,060 $1,206 Implemented
MS0103 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,365 $2,376 Implemented
MS0103 # 05 Y:1998 05 1998 BURN WASTE OIL FOR HEAT $8,596 $5,256 Not Implemented