IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0095 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,789 $800 Not Implemented
UA0095 # 03 Y:2013 03 2013 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $18,583 $59,040 Not Implemented
UA0095 # 04 Y:2013 04 2013 DISCONNECT BALLASTS $573 $324 Not Implemented
UA0095 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $562 $1,759 Not Implemented
UA0089 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $7,437 $680 Implemented
UA0089 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $200 Implemented
UA0089 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,506 $1,550 Not Implemented
UA0089 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,674 $51,251 Not Implemented
UA0089 # 05 Y:2012 05 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $124,000 $150,000 Not Implemented
UA3024 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200,861 $1,600 Not Implemented
UA3024 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $85,875 $23,130 Not Implemented
UA3024 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,436 $2,500 Implemented
UA3024 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $15,748 $2,000 Not Implemented
UA3024 # 05 Y:2012 05 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,972 $54,662 Not Implemented
UA3024 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,128 $66,849 Not Implemented
UA0084 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,489 $160 Implemented
UA0084 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,919 $640 Not Implemented
UA0084 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,106 $2,157 Implemented
UA0084 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,195 Implemented
UA0084 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,491 $800 Not Implemented
UA0084 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $4,093 Not Implemented
UA0084 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $812 $30 Implemented
UA0078 # 01 Y:2012 01 2012 BURN A LESS EXPENSIVE GRADE OF FUEL $217,328 $9,277 Not Implemented
UA0078 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $59,117 $13,031 Not Implemented
UA0078 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $15,318 $30,000 Not Implemented