Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
93
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0251 # 05 Y:2021 | 05 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,641 | $128 | Not Implemented |
UA0251 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $7,062 | $1,190 | Not Implemented |
UA0251 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $24,626 | $4,208 | Not Implemented |
UA0251 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,595 | $100 | Not Implemented |
UA0251 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,263 | $2,002 | Not Implemented |
UA0250 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,015 | $30,617 | Implemented |
UA0250 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,394 | $34,200 | Implemented |
UA0250 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $43,918 | $57,938 | Implemented |
UA0250 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,456 | $450 | Implemented |
UA0250 # 04 Y:2021 | 04 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $19,724 | $5,000 | Implemented |
UA0250 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,508 | $4,445 | Implemented |
UA0250 # 02 Y:2021 | 02 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,021 | $25,035 | Not Implemented |
UA0249 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $17,269 | Implemented |
UA0249 # 02 Y:2021 | 02 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $15,788 | $20,165 | Not Implemented |
UA0249 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $320 | $20 | Implemented |
UA0249 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,261 | $8,080 | Implemented |
UA0249 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $100 | Not Implemented |
UA0248 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,679 | $2,002 | Implemented |
UA0248 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,182 | $9,020 | Implemented |
UA0248 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $94 | $274 | Implemented |
UA0248 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,366 | $100 | Not Implemented |
UA0247 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,372 | $340 | Implemented |
UA0247 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $314 | $705 | Not Implemented |
UA0247 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $40,414 | $20,833 | Not Implemented |
UA0247 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,313 | $459 | Implemented |