IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0660 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $279 $300 Implemented
OK0660 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,891 $450 Implemented
OK0659 # 08 Y:2003 08 2003 $325,000 $625,000 n/a
OK0659 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,802 $152,022 Not Implemented
OK0659 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $7,958 $100 Implemented
OK0659 # 05 Y:2003 05 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $52,195 $19,043 n/a
OK0659 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $8,627 $31,408 Not Implemented
OK0659 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,247 $927 Not Implemented
OK0659 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,179 $4,683 Implemented
OK0659 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,223 $640 Implemented
AR0129 # 08 Y:1997 08 1997 $123,344 $597,000 Not Implemented
AR0129 # 07 Y:1997 07 1997 $143,923 $406,000 Not Implemented
AR0129 # 06 Y:1997 06 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,369 $200 Implemented
AR0129 # 05 Y:1997 05 1997 RECOVER AND REUSE COOLING WATER $6,680 $9,800 Not Implemented
AR0129 # 04 Y:1997 04 1997 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,495 $16,000 Not Implemented
AR0129 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,085 $0 Implemented
AR0129 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $81 Not Implemented
AR0129 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $491 $180 Implemented
AR0040 # 07 Y:1994 07 1994 REPAIR AND ELIMINATE STEAM LEAKS $16,520 $1,000 Implemented
AR0040 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,477 $1,000 Implemented
AR0040 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $770 $456 Implemented
AR0040 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,622 $4,610 Implemented
AR0040 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,921 $870 Implemented
AR0040 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,273 $250 Implemented
AR0040 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,679 $887 Implemented