IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0497 # 06 Y:2021 06 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,560 $453 Not Implemented
AS0497 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $926 $250 Implemented
AS0497 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $722 $569 Implemented
AS0497 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,227 $8,870 Implemented
AS0497 # 07 Y:2021 07 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $978 $315 Implemented
AS0461 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,690 $6,300 Implemented
AS0461 # 02 Y:2018 02 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,390 $30,436 Implemented
AS0461 # 01 Y:2018 01 2018 RECOVER AND REUSE WASTE MATERIAL $11,063 $0 Not Implemented
AS0461 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,926 $1,565 Not Implemented
AS0441 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $174,581 $25,494 Not Implemented
AS0441 # 03 Y:2017 03 2017 USE SOLAR HEAT TO HEAT WATER $1,380 $1,005 Not Implemented
AS0441 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,783 $37,000 Implemented
AS0436 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $100 Not Implemented
AS0436 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $8,511 $4,200 Not Implemented
AS0436 # 05 Y:2017 05 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,490 $12,200 Not Implemented
AS0436 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106,561 $115,692 Not Implemented
AS0436 # 03 Y:2017 03 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $887 $1,113 Not Implemented
AS0423 # 03 Y:2006 03 2006 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $13,786 $13,000 n/a
AS0423 # 01 Y:2006 01 2006 $205,767 $2,100,000 n/a
AS0423 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,401 $16,000 n/a
AS0423 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,912 $10,000 n/a
AS0423 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $13,316 $10,000 n/a
AS0423 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,786 $1,000 n/a
AS0422 # 01 Y:2006 01 2006 $562,419 $119,490 n/a
AS0422 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $13,918 n/a