IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0222 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,087 $3,745 Not Implemented
AS0222 # 10 Y:1998 10 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,828 $48,000 Not Implemented
AS0222 # 09 Y:1998 09 1998 TREAT AND REUSE RINSE WATERS $18,575 $800 Implemented
AS0222 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $407 $220 Implemented
AS0222 # 07 Y:1998 07 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $784 $480 Implemented
AS0222 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,487 $8,291 Implemented
AS0222 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,365 $60 Implemented
AS0222 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,243 $120 Implemented
AS0222 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,249 $280 Implemented
AS0222 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,367 $40,600 Not Implemented
AS0202 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $766 $1,350 Not Implemented
AS0202 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,012 $11,499 Implemented
AS0202 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,445 $8,160 Not Implemented
AS0202 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,839 $12 Implemented
AS0202 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,907 $3,500 Not Implemented
AS0202 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,182 $3,000 Implemented
AS0202 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,084 $9,599 Implemented
AS0202 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,753 $0 Not Implemented
AS0202 # 09 Y:1997 09 1997 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $665 $0 Implemented
AS0202 # 10 Y:1997 10 1997 TREAT AND REUSE RINSE WATERS $940 $500 Implemented
AS0202 # 11 Y:1997 11 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,407 $200 Not Implemented
AS0202 # 12 Y:1997 12 1997 $93,500 $750 Not Implemented
AS0034 # 11 Y:1991 11 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $343 $595 Not Implemented
AS0034 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,368 $356 Not Implemented
AS0034 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $9,504 $1,290 Not Implemented