Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0423 # 01 Y:2006 | 01 | 2006 | $205,767 | $2,100,000 | n/a | |
AS0422 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,736 | $9,000 | n/a |
AS0422 # 05 Y:2006 | 05 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,824 | $0 | n/a |
AS0422 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $13,918 | n/a |
AS0422 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,763 | $33,120 | n/a |
AS0422 # 01 Y:2006 | 01 | 2006 | $562,419 | $119,490 | n/a | |
AS0421 # 03 Y:2006 | 03 | 2006 | INSTALL EFFICIENT RECTIFIERS | $576 | $15,000 | n/a |
AS0421 # 02 Y:2006 | 02 | 2006 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,068 | $1,500 | n/a |
AS0421 # 01 Y:2006 | 01 | 2006 | $79,716 | $39,658 | n/a | |
AS0415 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,739 | $5,500 | Implemented |
AS0415 # 02 Y:2006 | 02 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,463 | $24,000 | Not Implemented |
AS0415 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,372 | $1,000 | Implemented |
AS0415 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $928 | $3,000 | Not Implemented |
AS0415 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $810 | $12,174 | Not Implemented |
AS0415 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO HEAT WATER | $132 | $2,800 | Not Implemented |