IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0347 # 07 Y:2003 07 2003 $27,104 $6,400 Not Implemented
AS0347 # 08 Y:2003 08 2003 $64,137 $800 Not Implemented
AS0347 # 09 Y:2003 09 2003 $15,165 $11,220 n/a
AS0343 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $20,633 Implemented
AS0343 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $228 $30 Not Implemented
AS0343 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,795 $30 Implemented
AS0343 # 04 Y:2003 04 2003 RECOVER MECHANICAL ENERGY $1,455 $250 Not Implemented
AS0343 # 05 Y:2003 05 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,973 $30,140 Not Implemented
AS0343 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,552 $6,867 Implemented
AS0343 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48 $134 Not Implemented
AS0343 # 08 Y:2003 08 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $6,600 $60 Implemented
AS0343 # 09 Y:2003 09 2003 MODIFY WORKLOAD $41,600 $250 Implemented
AS0343 # 10 Y:2003 10 2003 $10,575 $22,000 Implemented
AS0343 # 11 Y:2003 11 2003 $68,455 $3,840 Not Implemented
AS0343 # 12 Y:2003 12 2003 $319,824 $3,600 Not Implemented
AS0334 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,317 $0 Not Implemented
AS0334 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,247 $312 Not Implemented
AS0334 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $667 $1,350 Not Implemented
AS0334 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $424 $441 Not Implemented
AS0334 # 05 Y:2002 05 2002 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $32,221 $12,000 Not Implemented
AS0334 # 06 Y:2002 06 2002 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $3,596 $60 Not Implemented
AS0334 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,710 $5,232 Not Implemented
AS0334 # 08 Y:2002 08 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,926 $85 Not Implemented
AS0334 # 09 Y:2002 09 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,865 $8,955 Not Implemented
AS0334 # 10 Y:2002 10 2002 $379 $546 Not Implemented