Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0365 # 08 Y:2003 | 08 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $2,432 | $1,059 | n/a |
AS0365 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $290 | $1,535 | Implemented |
AS0365 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $88,723 | $78,120 | Not Implemented |
AS0365 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $790 | $1,643 | Implemented |
AS0365 # 06 Y:2003 | 06 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $274 | $350 | Implemented |
AS0365 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,328 | $60 | Implemented |
AS0365 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $30 | Not Implemented |
AS0365 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $140 | $450 | Not Implemented |
AS0364 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $990 | $150 | Not Implemented |
AS0364 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $221 | $524 | Not Implemented |
AS0364 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,291 | $31,527 | Not Implemented |
AS0364 # 05 Y:2003 | 05 | 2003 | REDUCE VENTILATION AIR | $285 | $10 | Not Implemented |
AS0364 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $7,928 | Not Implemented |
AS0362 # 01 Y:2003 | 01 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $577 | $0 | Implemented |
AS0362 # 05 Y:2003 | 05 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $16,801 | $2,470 | Implemented |
AS0362 # 04 Y:2003 | 04 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $6,720 | $4,060 | Implemented |
AS0362 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $141 | $450 | Not Implemented |
AS0362 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $922 | $4,350 | Implemented |
AS0360 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $344 | $1,350 | Not Implemented |
AS0360 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $301 | $616 | Implemented |
AS0360 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $10,463 | $18,810 | n/a |
AS0360 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $10,607 | Implemented |
AS0360 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,496 | $30 | Implemented |
AS0360 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,253 | $150 | Implemented |
AS0360 # 07 Y:2003 | 07 | 2003 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $2,438 | $8,705 | Not Implemented |