IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

230

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0503 # 01 Y:2017 01 2017 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,497 $7,120 Implemented
SF0503 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123,711 $243,952 Implemented
SF0503 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,829 $29,980 Implemented
SF0503 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,530 $102,500 Implemented
SF0503 # 03 Y:2017 03 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $802,468 $1,600,000 Implemented
SF0496 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $852 $90 Not Implemented
SF0496 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $546 Implemented
SF0496 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,454 $23,168 Implemented
SF0496 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,681 $3,001 Implemented
SF0496 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,437 $21,315 Not Implemented
SF0496 # 06 Y:2017 06 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,855 $20,327 Not Implemented
SF0496 # 07 Y:2017 07 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $169,204 $790,554 Not Implemented
SF0478 # 01 Y:2016 01 2016 USE POWER DURING OFF-PEAK PERIODS $5,976 $0 Implemented
SF0478 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,062 $48,543 Implemented
SF0478 # 07 Y:2016 07 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $323,906 $1,095,380 Implemented
SF0478 # 02 Y:2016 02 2016 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,324 $2,354 Implemented
SF0478 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,559 $6,856 Implemented
SF0478 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,956 $2,003 Not Implemented
SF0478 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $18,801 $20,415 Implemented
SD0487 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $55,346 $151,250 Not Implemented
SD0487 # 04 Y:2014 04 2014 REDUCE SCRAP PRODUCTION $4,795 $10,700 Implemented
SD0487 # 06 Y:2014 06 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,473 $2,350 Implemented
SD0487 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,282 $9,400 Implemented
SD0487 # 03 Y:2014 03 2014 UPGRADE OBSOLETE EQUIPMENT $9,337 $35,560 Implemented
SD0487 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,532 $99,966 Implemented