IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

350

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0481 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,008 $0 Not Implemented
SF0481 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $23,373 $0 Not Implemented
SF0481 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $105 Implemented
SF0481 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,030 $208 Not Implemented
SF0481 # 08 Y:2016 08 2016 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $119,304 $36,151 Not Implemented
SF0481 # 09 Y:2016 09 2016 UPGRADE CONTROLS ON COMPRESSORS $48,481 $18,682 Implemented
SF0481 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $660 $769 Implemented
SF0481 # 11 Y:2016 11 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,601 $10,000 Not Implemented
SF0481 # 12 Y:2016 12 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,674 $10,567 Not Implemented
SF0481 # 13 Y:2016 13 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,905 $11,333 Not Implemented
SF0424 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,423 $291,716 Implemented
SF0424 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $7,962 $46,705 Implemented
SF0424 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,537 $3,594 Not Implemented
SF0424 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,404 $1,224 Not Implemented
SF0424 # 03 Y:2013 03 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $10,307 $0 Implemented
SF0424 # 02 Y:2013 02 2013 REDUCE FLUID FLOW RATES $17,815 $0 Not Implemented
SF0424 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,789 $0 Implemented
SF0424 # 09 Y:2013 09 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,508 $26,000 Not Implemented
SF0424 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,020 $4,007 Not Implemented
SF0423 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,512 $0 Implemented
SF0423 # 01 Y:2012 01 2012 CLOSE OFF UNNEEDED STEAM LINES $417 $0 Implemented
SF0423 # 03 Y:2012 03 2012 INSTALL SET-BACK TIMERS $3,656 $0 Implemented
SF0423 # 04 Y:2012 04 2012 REPAIR OR REPLACE STEAM TRAPS $5,375 $3,925 Implemented
SF0423 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,157 $5,079 Not Implemented
SF0423 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $4,091 $4,108 Implemented