IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0594 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,580 $0 n/a
SF0594 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,717 $13,055 n/a
SF0594 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,143 $0 n/a
SF0594 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $38,807 $8,920 n/a
SF0594 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,385 $9,100 n/a
SF0594 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,583 $28,593 n/a
SF0594 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $559 $1,938 n/a
SF0594 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,223 $4,344 n/a
SF0558 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $98,999 $34,416 Implemented
SF0558 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,941 $0 Implemented
SF0558 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,186 $525 Not Implemented
SF0558 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $591 Implemented
SF0558 # 10 Y:2020 10 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $9,006 $75,000 Not Implemented
SF0558 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $282 $379 Implemented
SF0558 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,149 $6,701 Not Implemented
SF0558 # 07 Y:2020 07 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $30,342 $50,211 Not Implemented
SF0558 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,759 $2,995 Implemented
SF0558 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,252 $4,542 Implemented
SF0556 # 10 Y:2020 10 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,250 $1,064 Not Implemented
SF0556 # 09 Y:2020 09 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $57,865 $348,493 Implemented
SF0556 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,238 $5,536 Implemented
SF0556 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,729 $864 Implemented
SF0556 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,769 $2,289 Implemented
SF0556 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $959 $60 Implemented
SF0556 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,683 $575 Implemented