IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0420 # 12 Y:2012 12 2012 MINIMIZE WATER USAGE $5,598 $0 Not Implemented
SF0420 # 11 Y:2012 11 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $147,442 $498,340 Not Implemented
SD0427 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $2,200 Not Implemented
SD0427 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,780 $100 Not Implemented
SD0427 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,494 $2,714 Not Implemented
SD0427 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,124 $1,230 Not Implemented
SD0427 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,450 $10,035 Not Implemented
SD0427 # 06 Y:2010 06 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $540,797 $1,949,400 Not Implemented
SF0290 # 12 Y:2004 12 2004 INSTALL OCCUPANCY SENSORS $494 $646 Implemented
SF0290 # 15 Y:2004 15 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $130,619 $218,815 Not Implemented
SF0290 # 14 Y:2004 14 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,900 $20,000 Not Implemented
SF0290 # 13 Y:2004 13 2004 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $16,014 $0 Not Implemented
SF0290 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $643 $854 Implemented
SF0290 # 10 Y:2004 10 2004 REPAIR AND ELIMINATE STEAM LEAKS $870 $1,019 Implemented
SF0290 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,885 $6 Implemented
SF0290 # 08 Y:2004 08 2004 USE PHOTOCELL CONTROLS $708 $600 Implemented
SF0290 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,456 $15 Not Implemented
SF0290 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,732 $2 Implemented
SF0290 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,496 $4 Not Implemented
SF0290 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $2,231 $617 Not Implemented
SF0290 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,072 $0 Not Implemented
SF0290 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,309 $0 Implemented
SF0290 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,186 $0 Not Implemented
SD0327 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $50,120 $850,000 Not Implemented
SD0327 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,124 $5,000 Not Implemented