Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
212
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0518 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,705 | $25,900 | Not Implemented |
SD0518 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,578 | $13,930 | Not Implemented |
SD0518 # 04 Y:2015 | 04 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,761 | $4,200 | Not Implemented |
SF0468 # 10 Y:2015 | 10 | 2015 | REPLACE BOILER | $9,878 | $51,914 | Implemented |
SF0468 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,506 | $8,348 | Implemented |
SF0468 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $2,043 | $1,679 | Implemented |
SF0468 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $356 | $274 | Implemented |
SF0468 # 06 Y:2015 | 06 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,031 | $8,158 | Implemented |
SF0468 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,141 | $1,658 | Implemented |
SF0468 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,358 | $455 | Not Implemented |
SF0468 # 03 Y:2015 | 03 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,761 | $0 | Implemented |
SF0468 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,328 | $0 | Not Implemented |
SF0468 # 01 Y:2015 | 01 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $3,541 | $0 | Implemented |
SF0460 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,062 | $3,703 | Implemented |
SF0460 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,924 | $9,629 | Not Implemented |
SF0460 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,269 | $9,057 | Not Implemented |
SF0460 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,462 | $9,228 | Implemented |
SF0460 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,945 | $2,541 | Not Implemented |
SF0460 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,080 | $4,429 | Not Implemented |
SF0460 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $5,167 | $624 | Implemented |
SF0460 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,832 | $0 | Not Implemented |
SD0454 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,363 | $31,050 | Not Implemented |
SD0454 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $14,303 | $13,546 | Implemented |
SD0454 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $28,169 | $55,000 | Not Implemented |
SD0454 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $148,802 | $420,000 | Not Implemented |