IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
NAICS 337 Furniture and Related Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0433 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $881 $300 Implemented
SD0433 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,821 $5,000 Not Implemented
SD0433 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,508 $1,805 Implemented
SD0433 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $171 $100 Implemented
SD0380 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,026 $3,850 Not Implemented
SD0380 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,324 $220 Not Implemented
SD0380 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,495 $4,550 Not Implemented
SD0380 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,418 $2,325 Not Implemented
SD0380 # 05 Y:2006 05 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $459 $3,193 Not Implemented
LM0105 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $0 Not Implemented
LM0105 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,156 $960 Implemented
LM0105 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,197 $250 Implemented
LM0105 # 04 Y:2006 04 2006 $48,035 $1,500 Implemented
LM0105 # 05 Y:2006 05 2006 $3,978 $1,000 Implemented
SD0374 # 01 Y:2005 01 2005 $27,800 $0 Not Implemented
SD0374 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,927 $7,500 Implemented
SD0374 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,769 $140 Implemented
SD0374 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,982 $220 Implemented
SD0374 # 05 Y:2005 05 2005 COVER OPEN TANKS $2,000 $4,500 Not Implemented
SD0374 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $350 Implemented
SD0374 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,046 $52,243 Implemented
SF0302 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $0 Implemented
SF0302 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,557 $11,268 Not Implemented
SF0302 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $337 $748 Not Implemented
SF0302 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $1,638 Implemented