IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0421 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,282 $29,386 Implemented
SF0421 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,801 $22,991 Implemented
SF0421 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,912 $0 Not Implemented
SF0421 # 03 Y:2012 03 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,494 $10,564 Not Implemented
SF0421 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $70 Not Implemented
SF0417 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,459 $0 Implemented
SF0417 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $58 Not Implemented
SF0417 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,407 $16,180 Implemented
SF0417 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,829 $21,581 Not Implemented
SF0417 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,237 $239 Implemented
SF0417 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,063 $2,490 Not Implemented
SF0417 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $6,916 $31,417 Implemented
SF0417 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,561 $0 Not Implemented
SD0433 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $119 $10 Not Implemented
SD0433 # 03 Y:2011 03 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,821 $5,000 Not Implemented
SD0433 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,508 $1,805 Implemented
SD0433 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $171 $100 Implemented
SD0433 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $881 $300 Implemented
SF0380 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $360 Implemented
SF0380 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $2,873 $7,164 Implemented
SF0380 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $272 Implemented
SF0380 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,815 $3,010 Implemented
SF0380 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,794 $1,762 Implemented
SF0380 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $217 $631 Implemented
OR0537 # 03 Y:2008 03 2008 REDUCE SCRAP PRODUCTION $131,635 $140,000 Not Implemented