IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0124 # 07 Y:1997 07 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,394 $0 Implemented
SF0124 # 06 Y:1997 06 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,497 $3,347 Not Implemented
SF0124 # 05 Y:1997 05 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $302 $124 Implemented
SF0124 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $262 $623 Implemented
SF0124 # 02 Y:1997 02 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $756 $1,650 Implemented
SF0124 # 03 Y:1997 03 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,539 $4,000 Not Implemented
SF0124 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $242 $168 Implemented
SF0120 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,864 $7,560 Implemented
SF0120 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $105 $303 Implemented
SF0120 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $277 $677 Not Implemented
SF0120 # 04 Y:1997 04 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,187 $2,400 Not Implemented
SF0120 # 05 Y:1997 05 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,100 $250 Implemented
SF0120 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,766 $18,000 Implemented
SF0120 # 07 Y:1997 07 1997 $41,090 $6,912 Implemented
SD0170 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,642 $1,989 Implemented
SD0170 # 10 Y:1997 10 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,900 $9,000 Implemented
SD0170 # 09 Y:1997 09 1997 RECOVER AND REUSE WASTE MATERIAL $15,300 $5,500 Implemented
SD0170 # 08 Y:1997 08 1997 INSTALL OCCUPANCY SENSORS $1,790 $369 Implemented
SD0170 # 11 Y:1997 11 1997 WASH AND REUSE RAGS ON-SITE $2,920 $500 Implemented
SD0170 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,299 $26,840 Implemented
SD0170 # 07 Y:1997 07 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $618 $960 Implemented
SD0170 # 04 Y:1997 04 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $3,600 $7,000 Implemented
SD0170 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,009 $19,050 Implemented
SD0170 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,867 $400 Implemented
SD0170 # 03 Y:1997 03 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,854 $28,000 Not Implemented