IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0315 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,132 $3,500 Implemented
SD0318 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,100 $10,000 Not Implemented
SD0318 # 02 Y:2003 02 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,503 $25,000 Not Implemented
SD0318 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $44,624 $76,000 Not Implemented
SD0318 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $12,438 $8,500 Not Implemented
SD0318 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,018 $2,500 Implemented
SD0318 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $1,680 Not Implemented
SD0318 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $739 $300 Implemented
SD0270 # 11 Y:2001 11 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $648 $0 Implemented
SD0270 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,910 $15,000 Implemented
SD0270 # 13 Y:2001 13 2001 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $35,880 $0 Implemented
SD0270 # 14 Y:2001 14 2001 $1,393 $0 Not Implemented
SD0270 # 15 Y:2001 15 2001 $65,375 $30,000 Not Implemented
SD0270 # 01 Y:2001 01 2001 REDESIGN PROCESS $182,520 $35,000 Implemented
SD0270 # 02 Y:2001 02 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,642 $15,000 Implemented
SD0270 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,189 $800 Implemented
SD0270 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,100 $90,000 Not Implemented
SD0270 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,077 $36,000 Implemented
SD0270 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,823 $103,000 Implemented
SD0270 # 07 Y:2001 07 2001 INSTALL SKYLIGHTS $7,878 $12,500 Implemented
SD0270 # 08 Y:2001 08 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $983,363 $3,037,200 Not Implemented
SD0270 # 09 Y:2001 09 2001 RECOVER AND REUSE WASTE MATERIAL $32,522 $5,000 Implemented
SD0270 # 16 Y:2001 16 2001 $21,296 $30,000 Not Implemented
SD0270 # 10 Y:2001 10 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $3,170 $1,500 Implemented