IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,245

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0541 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,995 $4,078 Implemented
SD0541 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,692 $1,454 Implemented
SD0541 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,914 $30,240 Not Implemented
SF0479 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $70 Not Implemented
SF0479 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $210 Implemented
SF0479 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,397 $4,166 Implemented
SF0479 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $846 $2,490 Implemented
SF0479 # 05 Y:2016 05 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $24,263 $204,396 Not Implemented
SD0523 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $845 $36 Implemented
SD0523 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $3,171 Implemented
SD0523 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $700 Implemented
SD0523 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,188 $1,500 Implemented
SD0523 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,236 $1,000 Implemented
SD0523 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,728 $24,400 Implemented
SD0523 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,883 $11,174 Implemented
SD0523 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,463 $69,877 Implemented
SD0523 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $38,152 $147,781 Implemented
SD0521 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $566 $203 Not Implemented
SD0521 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $1,418 $3,648 Not Implemented
SD0521 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,279 $1,300 Not Implemented
SD0521 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,421 $3,450 Not Implemented
SD0521 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,938 $800 Not Implemented
SD0521 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,749 $1,000 Not Implemented
SD0521 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $8,590 $4,950 Not Implemented
SD0521 # 03 Y:2016 03 2016 RECOVER AND REUSE WASTE MATERIAL $11,486 $5,500 Not Implemented