IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,245

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0521 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $1,418 $3,648 Not Implemented
SD0521 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $566 $203 Not Implemented
SD0516 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,830 $48,900 Implemented
SD0516 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,584 $3,900 Implemented
SD0516 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $2,406 $2,370 Not Implemented
SD0516 # 04 Y:2015 04 2015 USE PHOTOCELL CONTROLS $1,539 $1,295 Implemented
SD0516 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,238 $200 Implemented
SD0516 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $797 $1,500 Implemented
SF0465 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,904 $0 Not Implemented
SF0465 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,736 $26,646 Implemented
SF0465 # 04 Y:2015 04 2015 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $914 $1,510 Not Implemented
SF0465 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,965 $3,081 Not Implemented
SF0465 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,344 $648 Implemented
SF0447 # 08 Y:2014 08 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $139,124 $745,024 Not Implemented
SF0447 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $15,131 Not Implemented
SF0447 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,962 $93,924 Not Implemented
SF0447 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $2,240 $6,743 Not Implemented
SF0447 # 04 Y:2014 04 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,158 $105,000 Not Implemented
SF0447 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,366 $4,235 Implemented
SF0447 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,248 $0 Implemented
SF0447 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,814 $70 Not Implemented
SF0446 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $15,048 Not Implemented
SF0446 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $7,640 $28,695 Implemented
SF0446 # 06 Y:2014 06 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $56,698 $210,000 Not Implemented
SF0446 # 05 Y:2014 05 2014 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $17,849 $58,975 Implemented