IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0276 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,791 $7,900 Not Implemented
SD0276 # 08 Y:2001 08 2001 $69,200 $50,000 Not Implemented
SD0276 # 09 Y:2001 09 2001 $43,085 $55,000 Not Implemented
SD0276 # 10 Y:2001 10 2001 $1,680 $200 Not Implemented
SD0274 # 01 Y:2001 01 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $126,144 $15,000 n/a
SD0274 # 02 Y:2001 02 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $37,083 $40,000 n/a
SD0274 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $48,575 $10,000 Not Implemented
SD0274 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $440 Implemented
SD0274 # 05 Y:2001 05 2001 USE POWER DURING OFF-PEAK PERIODS $36,091 $0 Implemented
SD0274 # 06 Y:2001 06 2001 INSTALL SKYLIGHTS $18,319 $50,000 Implemented
SD0274 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,712 $1,000 Implemented
SD0274 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,260 $8,000 Not Implemented
SD0274 # 09 Y:2001 09 2001 USE OPTIMUM TEMPERATURE $4,364 $0 Implemented
SD0274 # 10 Y:2001 10 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,682 $2,300 Not Implemented
SD0274 # 11 Y:2001 11 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $83,208 $2,000 Not Implemented
SD0274 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,500 $20,000 Implemented
SD0274 # 13 Y:2001 13 2001 $3,379 $0 Implemented
SD0274 # 14 Y:2001 14 2001 $73,321 $0 Implemented
SD0250 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,106 $210,000 Not Implemented
SD0250 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,752 $600 Implemented
SD0250 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,942 $4,100 Not Implemented
SD0250 # 04 Y:2000 04 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,901 $40,000 Not Implemented
SD0250 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $3,256 $8,000 Not Implemented
SD0250 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $148,200 $8,000 Not Implemented
SD0250 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $97,460 $135,000 Not Implemented