Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
741
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $788 | $1,660 | Not Implemented |
SD0637 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,393 | $700 | Implemented |
SD0637 # 09 Y:2023 | 09 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $1,900 | $2,000 | Not Implemented |
SD0637 # 06 Y:2023 | 06 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $53,597 | $0 | Not Implemented |
SD0637 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,625 | $49,475 | Not Implemented |
SD0637 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,827 | $115,927 | Not Implemented |
SD0637 # 08 Y:2023 | 08 | 2023 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,662 | $0 | Implemented |
SD0637 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $250 | Implemented |
SD0637 # 04 Y:2023 | 04 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,593 | $8,642 | Not Implemented |
CI0011 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,448 | $2,393 | n/a |
CI0011 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,753 | $500 | n/a |
CI0011 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,298 | $0 | n/a |
CI0011 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,181 | $6,150 | n/a |
CI0011 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $11,157 | $4,800 | n/a |
CI0011 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,809 | $20,000 | n/a |
CI0007 # 08 Y:2023 | 08 | 2023 | SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY | $663 | $0 | n/a |
CI0007 # 04 Y:2023 | 04 | 2023 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,248 | $4,500 | n/a |
CI0007 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $52,065 | $0 | n/a |
CI0007 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,880 | $300 | n/a |
CI0007 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,887 | $50 | n/a |
CI0007 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $853 | $0 | n/a |
CI0007 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,123 | $836 | n/a |
CI0007 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $4,072 | $15,610 | n/a |
SF0585 # 07 Y:2022 | 07 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $17,102 | $105,401 | Not Implemented |