Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
618
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0227 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $807,300 | $190,000 | Implemented |
SF0227 # 03 Y:2001 | 03 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,975 | $17,844 | Not Implemented |
SF0227 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $4,298 | Implemented |
SF0227 # 02 Y:2001 | 02 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,747 | $1,200 | Implemented |
SF0227 # 05 Y:2001 | 05 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,077 | $52 | Implemented |
SF0227 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $24,960 | $30,230 | Implemented |
SF0227 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,362 | $0 | Implemented |
SF0226 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $726 | $30 | Not Implemented |
SF0226 # 13 Y:2001 | 13 | 2001 | INSTALL OCCUPANCY SENSORS | $8,563 | $24,267 | Not Implemented |
SF0226 # 06 Y:2001 | 06 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $844 | $535 | Implemented |
SF0226 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,016 | $3,275 | Implemented |
SF0226 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,916 | $0 | Not Implemented |
SF0226 # 08 Y:2001 | 08 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,717 | $2,500 | Implemented |
SF0226 # 14 Y:2001 | 14 | 2001 | SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM | $9,549 | $15,524 | Not Implemented |
SF0226 # 04 Y:2001 | 04 | 2001 | OPERATE BOILERS ON HIGH FIRE SETTING | $16,154 | $1,260 | Not Implemented |
SF0226 # 05 Y:2001 | 05 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $35,839 | $11,800 | Implemented |
SF0226 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,294 | $0 | Not Implemented |
SF0226 # 11 Y:2001 | 11 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $863 | $1,126 | Implemented |
SF0226 # 12 Y:2001 | 12 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,217 | $8,000 | Not Implemented |
SF0226 # 09 Y:2001 | 09 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,944 | $14,649 | n/a |
SF0226 # 10 Y:2001 | 10 | 2001 | INSTALL OCCUPANCY SENSORS | $1,758 | $2,040 | Implemented |
SF0225 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $230 | $618 | Not Implemented |
LM0020 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,625 | $869 | Not Implemented |
LM0020 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,575 | $300 | Implemented |
LM0020 # 06 Y:2001 | 06 | 2001 | MODIFY WORKLOAD | $201,115 | $1,000 | Implemented |