IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0447 # 02 Y:2012 02 2012 INSTALL SKYLIGHTS $14,679 $13,457 Not Implemented
SD0447 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,656 $38,885 Not Implemented
SD0447 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $472 $640 Not Implemented
SD0447 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,491 $12,231 Not Implemented
SD0447 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $4,128 $7,660 Not Implemented
SD0445 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,123 $1,878 Implemented
SD0445 # 02 Y:2012 02 2012 REDESIGN PROCESS $30,890 $14,775 Not Implemented
SD0445 # 03 Y:2012 03 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $64,503 $109,675 Not Implemented
SD0445 # 04 Y:2012 04 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $351,013 $1,040,000 Implemented
SD0445 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,844 $39,150 Implemented
SD0445 # 06 Y:2012 06 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $84,757 $300,000 Implemented
SD0446 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $629 $100 Implemented
SD0446 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,854 $500 Implemented
SD0446 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,000 $4,045 Implemented
SD0446 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,478 $15,745 Implemented
SD0446 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,589 $3,425 Not Implemented
SD0446 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,195 $3,425 Not Implemented
SF0412 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $315 $0 Not Implemented
SF0412 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,954 $0 Not Implemented
SF0412 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,535 $314 Not Implemented
SF0412 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $806 $275 Not Implemented
SF0412 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,374 $8,843 Not Implemented
SF0412 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $798 $2,121 Not Implemented
SF0412 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,656 $19,110 Not Implemented
SD0444 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,992 $100 Implemented